🇵🇭 Submit your fan project and exchange 🅺Points with promotions!
🇵🇭 Current list of supported Philippines LED sites.
📍Trinoma Activity Center, Quezon City
🎯: 100000 🅺Points
📆Duration: 1 Day
Maximum collection days: 15 Days
✔︎ An image or video with (1792 px X 768 px) with 15 sec duration in landscape format.
📍EDSA Galleria Corporate Center, Ortigas
🎯: 200000 🅺Points
📆Duration: 1 Day
Maximum collection days: 30 Days
✔︎ An image or video with (840 px height X 448 px width) with 10 sec duration in vertical/portrait format.
📍EDSA Guadalupe Bridge, Makati City
🎯: 200000 🅺Points
📆Duration: 1 Day
📍EDSA Guadalupe Bridge, Makati City
🎯: 400000 🅺Points
📆 Duration: 1 Day
Maximum collection days: 30 Days
✔︎ An image or video with (1856 px width X 768 px height) with 10 sec duration in landscape format.
📍Maax Eye LED, MOA, Pasay City
🎯: 750000 🅺Points
📆Duration: 1 Day
📍MOA Arena Mesh, Pasay City
🎯: 1500000 🅺Points
📆Duration: 1 Day
📆 For single project, we only allowed a minimum of 2 weeks (15 Days) duration to fund the project and a maximum of 30 days for LED & multiple projects in one event.
❖ The submitted project will be reviewed by our team first and reach out to the project main handler for confirmation.
❖ If you are aiming for specific rewards but not included on our current list, please indicate in the form, DM us or email us at support@kbops.online .
⚠️ In case of the project was unable to reach after the funding end date, 🅺Points used will no longer be refunded.