🇵🇭 Submit your fan project and exchange 🅺Points with promotions!

🇵🇭 Current list of supported Philippines LED sites.


📍Trinoma Activity Center, Quezon City

🎯: 100000 🅺Points
📆Duration: 1 Day

Maximum collection days: 15 Days

✔︎ An image or video with (1792 px  X 768 px) with 15 sec duration in landscape format. 

📍EDSA Galleria Corporate Center, Ortigas

🎯: 200000 🅺Points
📆Duration: 1 Day

Maximum collection days: 30 Days

✔︎ An image or video with (840 px  height X 448 px width) with 10 sec duration in vertical/portrait format. 

📍EDSA Guadalupe Bridge, Makati City

🎯: 200000 🅺Points
📆Duration: 1 Day

Maximum collection days: 30 Days
 
✔︎ An image or video with (960 px height  X 640 px width ) with 10 sec duration in vertical/portrait format.

📍EDSA Guadalupe Bridge, Makati City

🎯: 400000 🅺Points
📆 Duration: 1 Day

Maximum collection days: 30 Days

✔︎ An image or video with (1856 px width X 768 px height) with 10 sec duration in landscape format.

📍Maax Eye LED, MOA, Pasay City

🎯: 750000 🅺Points
📆Duration: 1 Day

Maximum collection days: 30 Days

📍MOA Arena Mesh, Pasay City

🎯: 1500000 🅺Points
📆Duration: 1 Day

Maximum collection days: 30 Days

📆 For single project, we only allowed a minimum of 2 weeks (15 Days) duration to fund the project and a maximum of 30 days for LED & multiple projects in one event. 

❖ The submitted project will be reviewed by our team first and reach out to the project main handler for confirmation.

❖ If you are aiming for specific rewards but not included on our current list, please indicate in the form, DM us or email us at  support@kbops.online . 

⚠️ In case of the project was unable to reach after the funding end date, 🅺Points used will no longer be refunded.